Kanach Jakhau
Project Information
Worked on the ground-mount installation of a 4.5 MW solar plant under KP Group, executing civil foundation work and structure erection. Fabricated and installed the galvanised mounting structures with precise alignment, leveling, and anchoring. Mounted solar modules carefully, ensuring optimal string configuration and mechanical strength. Coordinated electrical works, including DC/AC cabling, inverter placement, and earthing systems. Performed pre-commissioning tests, quality checks, and handover documentation to ensure safe and reliable plant operations.
Scope of Project
- Installed by: KP Group pvt
- Status: Completed
- Location: Kanach Jakhau