About the project

Project Date:

18 November, 2025

Project Capacity:

300 kWh

Category:

Completed

Client / Company:

TATA Power

Project Location:

Mahesana

Project Information

Executed ground-mount structure fabrication and galvanized steel installation for a utility-scale Tata Power solar project. Performed precise alignment, leveling, and anchoring of mounting systems across the plant area. Led module mounting operations ensuring optimal string formation and structural integrity. Coordinated DC cabling, inverter placement, AC cabling, earthing, and safety components installation. Conducted rigorous testing, safety inspections, and quality assurance before system handover.

Scope of Project

  • Installed by: TATA Power
  • Status: Completed
  • Location: Mahesana