About the project

Project Date:

N/A

Project Capacity:

2.00 MW

Category:

Completed

Client / Company:

ABR ENERGY

Project Location:

Project Information

Led the ground-mount structure fabrication and installation for the solar plant, working closely with ABR Energy’s EPC team. Executed precise alignment, leveling, and anchoring of mounting structures to ensure long-term mechanical stability. Supervised module mounting and string formation, ensuring optimal layout and configuration. Coordinated the electrical installation including DC/AC cabling, inverter setup, and earthing systems. Performed rigorous quality checks, safety inspections, and pre-commissioning tests before project handover.

Scope of Project

  • Installed by: ABR ENERGY
  • Status: Completed
  • Location: