ABR ENERGY Sadodar
Project Information
Led the ground-mount structure fabrication and installation for the solar plant, working closely with ABR Energy’s EPC team. Executed precise alignment, leveling, and anchoring of mounting structures to ensure long-term mechanical stability. Supervised module mounting and string formation, ensuring optimal layout and configuration. Coordinated the electrical installation including DC/AC cabling, inverter setup, and earthing systems. Performed rigorous quality checks, safety inspections, and pre-commissioning tests before project handover.
Scope of Project
- Installed by: ABR ENERGY
- Status: Completed
- Location: